Fuyuang Portable 3 Years Warranty 24V 10A Electronic Equipment Air Purifier Power Adapter

Still deciding? Get samples of $ !
Request Sample

Product Description

Basic Information
Model NO.FY24010000CertificationTUV, RoHS, ISO9001, CCC
ColorBlackTypePower Supply
ConnectionDesktopProduct NameUniversal 24V 10A Power Supply
Warranty3 YearsProtectionsShort Circuit, Ovp, Otp, Olp
AC Input100-240V, 50/60HzMaterialPC Fireproof Material
Dimension178*80*46mmWeight0.78kgs/PCS
Product Description

Flexible and portable 24V 10A electronic equipment power adapter, ideal for air purifiers and industrial applications. Built with over 25 years of engineering expertise, specializing in 60-500W high-power solutions.

Power Adapter Detail 1
Power Adapter Detail 2
Technical Parameters
Input Voltage100-240VAC, 50/60Hz
Output Voltage24V
Output Current10A
Operating Temperature-29ºC ~ +45.5ºC
MTBF370,000 hours at 25ºC
Safety StandardUL60950, EN55022, EN60335, GB4943.1, J60950
Parameter Chart
Our Advantages
  • Global certificates including CE, GS, CB, UL, CUL, FCC, PSE, SAA, RCM, KC, CCC, ROHS, REACH.
  • 100% burn-in tested and inspected with Automatic Test Equipment (ATE).
  • Key components like transformers and cases manufactured in-house.
  • Comprehensive protection: Short Circuit, Overvoltage, OCP, and Hipot testing.
  • 3-year unconditional quality guarantee for undesigned damage.
Product Gallery
More View 1
More View 2
More View 3
Factory & Certifications
Factory View
Certificates
Packaging & Shipping
Packaging Detail
Frequently Asked Questions
Q1: What is the warranty for your power products? We offer a 3-year guarantee. If a product is damaged under normal use, we provide unconditional replacement.
Q2: What types of chargers do you manufacture? We manufacture Lithium, Lead-acid, LiFePo4, and NiMH battery chargers.
Q3: What is the power range you can provide? We offer outputs from 24W to 1000W, with voltages from 3V to 118V and currents up to 20A.
Q4: How is the quality control process handled? Every unit undergoes strict testing: Open Frame Performance, Aging Testing (4 hours), Drop Testing, and Final Performance inspection.
Q5: What is the standard lead time for orders? Samples take 3-5 days; mass production typically takes 15-20 days depending on the quantity.
Q6: Do you support customized manufacturing? Yes, we fully support both OEM and ODM services to meet specific technical requirements.

Related Products